Q1. What role do you perform within
your company?
Managerial
Architectural
Quantity Surveying
Engineering
Other
Q2. Which best describe your position?
Owner/Client
Architects
Consultant
Contractor
Specialist Contractor
Other
Q3. In what location is your
organization's office located?
O4. Does your company currently in
use BIM?
Q5. Are you aware of BIM and its
benefits?
Q6. What level of BIM is your
company operating at?
Level 0 -Traditional Processes (2D drawing)
Level 1 -Lonely BIM (3D Modelling)
Level 2 -Collaborative BIM (4D programme data or 5D cost elements)
Level3 -Integrated Project Delivery (Completely open design process and datais integrated with use of web services)
Q7. Which
BIM activities did you used in your projects?
| Yes | No |
Alternate Design Development/Concept design | | |
Visualization/Walkthrough Deliverables | | |
Structural Analysis | | |
Energy Analysis | | |
Shop drawings/As-built | | |
Trade Coordination | | |
Cost Estimating | | |
Time Estimating | | |
Collision Detection | | |
Option Analysis | | |
Quantity Take offs | | |
Procurement | | |
Specifications | | |
Construction Sequencing | | |
Virtual Mock-Ups | | |
Fabrication | | |
Building Performance | | |
Building Record | | |
Facility Management in Operations | | |
Other | | |
Q8. What
are the most valuable outcomes of BIM use in your projects?
| StronglyAgree | Agree | Neutral | Disagree | StronglyDisagree |
Alternate Design Development/Concept design | | | | | |
Visualization/Walkthrough Deliverables | | | | | |
Structural Analysis | | | | | |
Energy Analysis | | | | | |
Shop drawings/As-built | | | | | |
Trade Coordination | | | | | |
Cost Estimating | | | | | |
Time Estimating | | | | | |
Collision Detection | | | | | |
Option Analysis | | | | | |
Quantity Take offs | | | | | |
Procurement | | | | | |
Specifications | | | | | |
Construction Sequencing | | | | | |
Virtual Mock-Ups | | | | | |
Fabrication | | | | | |
Building Performance | | | | | |
Building Record | | | | | |
Facility Management in Operations | | | | | |
Other | | | | | |
Q9. What are the benefits of using
BIM?
Improved design quality
Improved documents management
Enhanced coordination
Improved conflicts detection
Reduced rework
All above
Q 10. How much did BIM technology increase
productivity of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 11. How much did BIM technology
improve documents
management of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q12. How much did BIM technology
enhance coordination of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 13. How much did BIM technology
Improve conflicts detection of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 14.
How much did BIM technology
reduce rework of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q15. How much did BIM technology
reduce waste material of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 16.
How much did BIM technology reduce
working time of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 17. How much did BIM technology
works cost of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 18.
How much did BIM technology
reduce claims of project?
0%
5%
10%
15%
20%
25%
Over 25%
Q 19.
How much did BIM technology
enhance quality final results of project?
0%
5%
10%
15%
20%
25%
Over 25%